Creep
Continuous load
Unfilled PTFE creeps under continuous compressive load. A gasket or pad brief still needs the buyer to state thickness and the duty; this desk will not invent a compressive strength.
Check whether a quoted item genuinely satisfies expanded ptfe sheet, or only resembles it. PTFE Sheet Sourcing does not certify a factory and does not reprint a hardness, thickness or density as its own.
Ask which published figure and which standard were used to state color/finish and the applicable ASTM or equivalent method. A cell that only says “PTFE” is not a method.
Skived plate, molded ptfe sheet and expanded ptfe sheet can share a family name and still be different goods. The factory has to say which construction is on the invoice line.
If the supplier proposes a different expanded ptfe sheet model, re-issue thickness, width and sheet size, density in g/cc if used, color/finish and the method. Do not keep the old line number.
A plant ISO file does not stand in for the lot. Food-contact or REACH statements must name the quoted configuration.
When a buyer asks for tensile strength (MPa), elongation at break (%), or an operating temperature in °C, write the figure and the method together. Industry datasheets often discuss PTFE near 10-25 MPa tensile or continuous service well above 150°C, but those cells belong to the named supplier page, not to this desk.
Creep
Unfilled PTFE creeps under continuous compressive load. A gasket or pad brief still needs the buyer to state thickness and the duty; this desk will not invent a compressive strength.
Melt
PTFE is not melt-welded like PE or PP. If the project assumed a welded liner, that assumption has to be written down as a different construction.
Fill
Filled grades trade chemical purity and dielectric behavior for wear. Treating a carbon-filled pad as virgin ptfe sheet is a new request.
Natural, black or a named color; skived vs expanded surface.
The published figure and the standard used for that figure.
Inches or millimetres plus finished width and sheet size.
Food-contact or REACH only when the lot is named.
1
Quoted construction named on the invoice line
2
Published figure plus the standard behind it
3
Axes re-checked after any model change
0
Site-owned certificates or hardness reprints
Include the factory’s wording next to your request wording. We will list gaps; we will not invent a match.
Review Specifications How we read a quote